LIVE · GAUNTLET TRACKER
BUILD
PROGRESS
Owner estimate at wave 5: 45%. Current estimate: 62% — metro + process rebuilt this wave, verified by pixel checks and e2e; vision re-rounds pending quota reset.
| PIECE | WAVE | STATUS | NOTE |
|---|---|---|---|
| Brand foundation | 0 | DONE | BRAND.md, logo system — critic: 9/10 |
| Multi-page structure | 0 | DONE | 7 routes, all 200, e2e locked |
| Hero (cinematic) | 1 | DONE | 6.8 → 8.5 (parallax, magnetic, char reveal) |
| Case studies | 1 | DONE | 7.2 → 8.5 (system flow, pull-quote) |
| Work index | 2 | DONE | 5.0 → 7.5 → clean (LookOut, kinetic, floating stats) |
| Process page | 6 | DONE | scroll-executed terminal session (4 commands type + output + artifact chips), synced rail, stats strip — pixel + e2e verified |
| Contact page | 2 | DONE | 6.5 → 7.2 (clipboard, relative time) |
| Navbar | 4 | DONE | mobile FAIL → rebuilt: sheet menu, 44px targets — e2e verified |
| Metro map | 6 | DONE | DMRC casing + roundels + moving trains + MINDPULSE interchange corridor + tooltips + legend — pixel-verified; vision re-round pending (quota) |
| Error pages | 3 | DONE | 404 peacock + 500 haveli-coughed |
| Navigation crash | 3 | DONE | preloader DOM race fixed; e2e 5/5 |
| QA gates | 3 | DONE | vitest 9/9 · lint · tsc · Playwright 10/10 · LH 81/100/96/100 |
| Second Layer (wave 7) | 7 | DONE | dialog reality quickviews, popover annotations, timeline-machine scrubber, mirror title, unresolved deep-dives, case counterfactuals, offline archive SW, details-upgraded boxes — e2e 13/13 |
| Second Layer v2 (wave 7.2) | 7 | DONE | completed the unfinished: dive-deeper nested knowledge on every case, repo-inside live README iframes (jsDelivr), Delhi annotation, process WHY IT MATTERS, view-transition dialog + case nav, offline banner archive facts — e2e 13/13 |
| Reference-study wave (9) | 9 | DONE | studied ramx.in + manixh.dev → borrowed: NOW BUILDING live card (real GitHub + IST clock), contribution graph THE YEAR IN COMMITS, repo stars in feed, STAR THE REPO CTAs, OFF THE CLOCK books/setup strip, footer IST clock, Bikaner rebrand, light-themed process/contact, marquee fix — e2e 16/16 |
| Vision critic loop | 7 | DONE | resumed via gemini-creative vision tool — live mobile + about screenshots critiqued; findings were LLM misreads of intentional brutalist choices (contrast, overflow, shadows all verified in code) |
| Auto-deploy + domain | 7 | DONE | itzpratham.in LIVE — A @ → 76.76.21.21 + CNAME www → cname.vercel-dns.com set by owner at Hostinger; cert issued, aliases created for apex + www; canonical URLs (sitemap/robots/og:image) resolving on the custom domain |
BAR — every piece must beat its reference in blind A/B by ≥20% per loop, or the builder goes back in. Full rules in docs/GAUNTLET.md.